MarketsServicesProjectsSafetyAboutCareersContact
Stormwater detention tank under construction at Guildford Park Secondary, with excavators behind
← All projects
In progressSecondary school additionSurrey

Guildford Park Secondary School Addition

Secondary school addition · Surrey · 2025 to present

NSC built
Client
School District #36
Construction manager
Unitech Construction Management
Started
Sep 2025
Status
In progress

About the project

Full civil scope for a major secondary school addition in Surrey, from bulk excavation and a large stormwater detention tank to new frontage works.

The addition sits beside the school's sports field. Before the building could go up, the site needed bulk excavation, new deep utilities and a way to hold back stormwater on site.

The centrepiece is an underground detention tank. We excavated the pit, placed the liner and built the tank from modular chambers, then installed the flow control manholes that meter water back into the city system.

Onsite and offsite work continues around the occupied school, with fire and domestic water, BC Hydro and electrical, curb, sidewalks and paving.

Detention tankbuilt from modular chambers
Onsite + offsitesewer and water upgrades
Sep 2025mobilized
SD #36Surrey Schools

How the job ran

  1. Sep 2025Mobilization and bulk excavation
  2. Sep 2025Detention tank liner and chamber install
  3. Fall 2025Water, sewer and electrical upgrades
  4. Winter 2025Curb and gutter along the field
  5. 2026Frontage works and paving

On site

From the field.

Contact

Planning a similar project?

Talk to our team about site services, civil works and earthworks.